No | Nama Peserta | K | Skor Kualifkasi |
Skor Pembuktian |
B | A | T | Skor Teknis |
Penawaran | Penawaran Terkoreksi | Hasil Negosiasi | H | Skor Harga |
Skor Akhir |
P | PK | Alasan |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1 | PT. KOSA MATRA GRAHA - 71.644.163.9-652.000 | 100.0 | 100.0 | 90.24 | Rp. 280.885.000,00 | Rp. 280.885.000,00 | 100.0 | 92.19 | |||||||||
2 | CV. CHATUR PILAR HUTAMA - 02.515.247.1-652.000 | 64.46 | 64.46 | 86.0 | Rp. 327.327.000,00 | Rp. 327.327.000,00 | 85.81 | 85.96 | |||||||||
3 | CV Darussalam - 02.209.982.4-616.000 | ||||||||||||||||
4 | CV. INTI KONSULT - 08.685.058.3-621.000 | ||||||||||||||||
5 | CV. FATEK ENGINEERING CONSULTANT - 03.263.211.9-822.000 | ||||||||||||||||
6 | PT. ERA CIPTA ANUGRAH PERKASA - 74.515.925.1-618.000 | ||||||||||||||||
7 | CV. BANGUN KARYA MANDIRI - 02.525.040.8-619.000 | 52.5 | 52.5 | 63.49 | Tidak memenuhi nilai ambang batas lulus: nilai total, nilai unsur pengalaman perusahaan; serta, nilai unsur metodologi dan pendekatan | ||||||||||||
8 | CV. MAKARYA ENGINEERING - 66.088.858.7-614.000 | 37.63 | 37.63 | ||||||||||||||
9 | PT. BIOLA TEKNIK INDONESIA - 71.938.923.1-722.000 | ||||||||||||||||
10 | CV . KEBONAGUNG INDAH - 75.147.436.2-654.000 | ||||||||||||||||
11 | PT. WAHANA PRAKARSA UTAMA CABANG JATIM - 02.173.702.8-652.001 | ||||||||||||||||
12 | PT.DEWI PERMATA MANDIRI - 01.612.818.3-626.000 | 65.0 | 65.0 | ||||||||||||||
13 | PT. KURNIA UTAMA RAYA MULTI - 31.497.424.7-643.000 | ||||||||||||||||
14 | HANDASA ENGINEERING CONSULTANT - 31.695.070.8-652.000 | ||||||||||||||||
15 | cv.mumtaz karya teknik - 80.350.884.5-657.000 | ||||||||||||||||
16 | CV.ARYASA INDAH - 02.570.710.0-657.000 | ||||||||||||||||
17 | CV. MULIA JAYA MAKMUR - 31.396.155.9-657.000 |
- A Evaluasi Administrasi
- T Evaluasi Teknis
- K Evaluasi Kualifikasi
- B Pembuktian Kualifikasi
- H Evaluasi Harga/Biaya
- P Pemenang
- PK Pemenang Berkontrak